Select the gown production type. This affects baseline labor hours and overhead.
Primary fabric chosen for the gown — affects material cost per meter and waste allowance.
Embellishments (multi-select)
Select all embellishment types that apply. Each adds material and labor hours.
Select silhouette/complexity which drives pattern complexity and labor hours.
Is this a fully custom design requiring pattern drafting and fittings?
Number of scheduled fittings (affects labor and travel/time costs). Enter whole number.
Region to apply local labor multipliers and material availability adjustments.
Select the currency for calculations